Restoration of works in wood and metal carpentry.
Intervention to recover works in wood and metal carpentry with verification of seismic vulnerability of the structures of the Bridge of the Academy.

Client: Comune di Venezia
Tipology: Infrastructure
Size: bridge length 48 m
Status: Completed